whatsapp_image_2023-05-12_at_13.37.23_cropped.jpg

Meiboom celebration Hotel Duo

Symbolic moment today at the Hotel Duo (Holiday Inn and Adagio) construction site in Diegem. The project has reached its highest point, and approximately 130 employees from Cordeel, developer Candor, Binst Architects, engineering firm Macobo-Stabo, and Imtech gathered for the meiboom (maypole) celebration. It was the perfect opportunity to thank everyone for their hard work with some food and drinks.

Cordeel is building 2 new hotels on Berkenlaan in Diegem, nearby Zaventem airport. The Holiday Inn hotel consists of 9 floors and has 208 hotel rooms. The Adagio hotel has 7 floors and is an aparthotel with 160 rooms. Spaces with supporting functions will be provided on the ground floor.

Imtech is responsible for all the technical installations for this project, from HVAC and sanitary to all the electrical installations.

Other news