Aquatopia Aalst
The first phase consists of a 50-meter pool, a 25-35-meter pool with sinking retaining walls and movable bottoms, a triathlon room, diving towers of 1, 3 and 5 m height and a drowning person detection system. This phase was completed in October 2021.
The second phase entails an extensive fun section with more than 200 meters of slides, a fast slide with light effects (94m), a slower slide more suitable for families and smaller children (86m), a group slide of no less than 4 meters wide and for the little ones, several smaller slides with a total length of 35 meters are provided in different shapes and lengths. There is also an instruction pool with a movable floor for aqua fitness and to teach children to swim, and a multifunctional sports hall. This recreational part was officially inaugurated in December 2022.
Other partners of Cordeel Group in this project:
- C-concrete (rebar and precast concrete)
- C-metal (steel structure)
- C-wood (wooden doors)
- Imtech (high voltage cabin)
- Baeck Cladding (facade)